JR Thomas Group completed the renovation of two student restrooms at Shotwell Middle School, delivering a full interior upgrade within an active campus environment. The project included selective demolition, replacement of plumbing systems, and installation of new tile finishes, partitions, fixtures, and lighting. Additional investigative work was performed to identify and address underlying drainage issues, ensuring long-term performance. Completed on a fast-tracked 6-week schedule, the renovations improved functionality, durability, and alignment with district standards.

Client: Aldine ISD

Location: Shotwell Middle School

Surface Area: 420 sqft

Year Completed: 2022

Value: $256,470

Project Type: Bathroom Renovation

Shotwell Middle School Bathroom Renovation

The scope of work included the complete demolition and renovation of two existing student restrooms, requiring careful coordination to access and replace aging plumbing infrastructure. Demolition consisted of removing floor finishes, ceiling systems, partitions, fixtures, and approximately 25 linear feet of wet walls to expose plumbing carriers, drain lines, and supply systems. This selective demolition approach allowed the team to investigate existing conditions while preparing the space for full reconstruction.

Reconstruction included installation of new plumbing carriers, drain and supply line connections tied into existing systems, and rebuilding of wall sections using CMU block. Interior finishes were upgraded with new porcelain floor tile, full-height wall tile, ceiling grid systems, and phenolic partitions. The project also included installation of new toilets, urinals, lavatories, flush valves, mirrors, grab bars, LED lighting, and other accessories to modernize the facilities and improve durability.

Additional scope elements included installation of a new mop sink and bi-level drinking fountains, along with plumbing investigation services using camera equipment to identify potential blockages or failures in existing lines. The project was executed within a compressed schedule, requiring efficient coordination of trades and materials to deliver fully functional, updated restroom facilities aligned with district standards.

Project Challenge

  • Working Within Existing Infrastructure

  • Maintaining Consistency with Existing Campus Standards

  • Phased Interior Demolition and Reconstruction

  • Occupied Building